+387 (0)51 337 401
  • YouTube
  • YouTube

Heavy maintenance (upgrading) of the state road IA3, section: border CRO/SER (Batrovci) – Kuzmin 1, from km 0+554.86 to km 22+196.11 (left carriageway) and from km 0+564.64 to km 22+229.16 (right carriageway)

Apr 7, 2020

CONTRACT NUMBER RRSP/RRW-IA3BK/2017-07
Investor: PC “Roads of Serbia” Belgrade
Contractor: Integral inženjering a.d. (PLC)
Work value: 38,7  million BAM or 19,8 m EUR

About the project:

The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of 21.65 km. Works on section with the biggest traffic load in the Republic of Serbia will be executed under the traffic, i.e. without total stoppage.

The works include the following:

  • preliminary works,
  • works on road base and superstructure,
  • rehabilitation works on structures (bridges),
  • works on improvement of drainage system,
  • works on road belt,
  • works on placing of traffic signalization and equipment and
  • works on public lightning.

Prethodne novosti