Construction of the main road M-17.3 Neum – Stolac, Lot 1

Apr 9, 2020

Employer:PC “Roads of the Federation of Bosnia and Herzegovina“ d.o.o. (PLC) Sarajevo
Contractor:“Integral Inženjering“ a.d. (LTD) Laktaši
Contract value:6.03 million BAM or 3.08 million EUR
Engineer:IC consulenten Ziviltechniker GesmbH (Austria) in cooperation with Nievelt GmbH (Austria) and AIK Inženjering d.o.o. (PLC) (Bosnia and Herzegovina)

Project description:

The completion works on construction of the main road M 17.3 Neum – Stolac (total length of 32.9 km) are part of the Federation Road Sector Modernization Project. The Project is financed from the loan of World Bank and European Investment Bank.

The works on LOT 1 (L= 7 km) include the following:

  • pavement of road section Stari Neum – Babin Do (L= 5.3 km),
  • construction of road section Babin Do – Oštrovac (L= 1.7 km),
  • construction of underpass Oskrušnica at km 6+719.15 m, (L=10.8 m) and
  • construction of tunnel Oštrovac (L=190 m).