{"version":"1.0","provider_name":"Integral In\u017eenjering","provider_url":"https:\/\/integral.ba\/en\/","author_name":"admin","author_url":"https:\/\/integral.ba\/en\/author\/admin\/","title":"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"GH1mqwffke\"><a href=\"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/\">Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina)<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/embed\/#?secret=GH1mqwffke\" width=\"600\" height=\"338\" title=\"&#8220;Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina)&#8221; &#8212; Integral In\u017eenjering\" data-secret=\"GH1mqwffke\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script type=\"text\/javascript\">\n\/* <![CDATA[ *\/\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/integral.ba\/wp-includes\/js\/wp-embed.min.js\n\/* ]]> *\/\n<\/script>\n","thumbnail_url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/proboj-tunela.jpg","thumbnail_width":1600,"thumbnail_height":757,"description":"Investor:&nbsp;HPP \u201cDabar\u201d Ltd, TrebinjeContract Number:434-18\/16, our ref. 287\/16Value of works:&nbsp;67 m EUR (131 m BAM) Broader context of the Project:The design of using of hydro system Trebi\u0161njica is based on the construction of several hydro technical structures (dams, accumulations, open channels, tunnels and hydro power plants) with which water from karst fields of East Herzegovina [&hellip;]"}