{"id":21889,"date":"2020-04-08T11:17:00","date_gmt":"2020-04-08T09:17:00","guid":{"rendered":"https:\/\/integral.ba\/izgradnja-autoputa-banja-luka-gradiska-2012\/"},"modified":"2021-05-26T13:03:46","modified_gmt":"2021-05-26T11:03:46","slug":"izgradnja-autoputa-banja-luka-gradiska-2012","status":"publish","type":"post","link":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/","title":{"rendered":"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina)"},"content":{"rendered":"\n<p><strong>Investors: <\/strong>Public Company &#8220;Republic of Srpska Roads&#8221;&#8221; and Public Company &#8220;&#8221;Republic of Srpska&nbsp;Motorways&#8221;<br><strong>Contractor:<\/strong> Integral in\u017eenjering a.d. (PLC), Lakta\u0161i<br><strong>Financing:<\/strong>&nbsp;European Bank for Reconstrucion and Development (EBRD), European Investment Bank (EIB), local funds<\/p>\n\n\n\n<p><strong>Projects\u2019 value:<\/strong>&nbsp;100,0 milion EUR or 195,6 milion BAM<br><strong>Engineer:<\/strong> JV \u201eC.Lotti &amp; Associati (Italy) i IRD engineering (Italy)\u201c<\/p>\n\n\n\n<p><strong>About the Projects:<\/strong><br>Motorway Banja Luka \u2013 Gradi\u0161ka is located on the European route E\u00a0661, which, asan integral part of the\u00a0<a href=\"https:\/\/en.wikipedia.org\/wiki\/International_E-road_network\">inter-European road system<\/a>, connects\u00a0central\u00a0<a href=\"https:\/\/en.wikipedia.org\/wiki\/Bosnia_(region)\">Bosnia<\/a> and Herzegovina with Zagreb\u00a0\u00a0&#8211; Belgrade motorway, and with <a href=\"https:\/\/en.wikipedia.org\/wiki\/Hungary\">Hungary<\/a>\u00a0(<a href=\"https:\/\/en.wikipedia.org\/wiki\/Lake_Balaton\">Lake Balaton<\/a>). The project was divided into three lots (contracts). After being completed,\u00a0the motorway has become important factor of local and regional economic development.It will reach its full capacity\u00a0after the construction of the\u00a0new bridge over the River Sava (border line between Croatia and Bosnia and Herzegovina).<\/p>\n\n\n\n<p>The Project included construction of:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>&nbsp;33,7 km of motorway (from the Sava River to Kla\u0161nice);<\/li><li>13 overbridges, 3 underbridges and 2 viaducts;<\/li><li>4 tunnels (2 x L = 380,0 m; 2 x L = 430,0 m);<\/li><li>3 intersections (\u010catrnja, Berek, Mahovljani) with lightening;<\/li><li>2 lendings (Lu\u017eani P = 66.000,0 m<sup>2<\/sup>; Romanovci P = 42.000,0 m<sup>2<\/sup>);<\/li><li>67 culverts for rainwater;<\/li><li>71 km concrete drainage channels for collecting and channelling of rainwater;<\/li><li>30 km of sewers for rainwater (pipeline);<\/li><li>17 water treatment plants i.e. degreasing of rainwater that is collected on the motorway;<\/li><li>15 km of asphald paved and 30 km of macadam local roads.<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Investors: Public Company &#8220;Republic of Srpska Roads&#8221;&#8221; and Public Company &#8220;&#8221;Republic of Srpska&nbsp;Motorways&#8221;Contractor: Integral in\u017eenjering a.d. (PLC), Lakta\u0161iFinancing:&nbsp;European Bank for Reconstrucion and Development (EBRD), European Investment Bank (EIB), local funds Projects\u2019 value:&nbsp;100,0 milion EUR or 195,6 milion BAMEngineer: JV \u201eC.Lotti &amp; Associati (Italy) i IRD engineering (Italy)\u201c About the Projects:Motorway Banja Luka \u2013 Gradi\u0161ka is [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":41224,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"categories":[40],"tags":[],"class_list":["post-21889","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-completed-capital-projects"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering\" \/>\n<meta property=\"og:description\" content=\"Investors: Public Company &#8220;Republic of Srpska Roads&#8221;&#8221; and Public Company &#8220;&#8221;Republic of Srpska&nbsp;Motorways&#8221;Contractor: Integral in\u017eenjering a.d. (PLC), Lakta\u0161iFinancing:&nbsp;European Bank for Reconstrucion and Development (EBRD), European Investment Bank (EIB), local funds Projects\u2019 value:&nbsp;100,0 milion EUR or 195,6 milion BAMEngineer: JV \u201eC.Lotti &amp; Associati (Italy) i IRD engineering (Italy)\u201c About the Projects:Motorway Banja Luka \u2013 Gradi\u0161ka is [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/\" \/>\n<meta property=\"og:site_name\" content=\"Integral In\u017eenjering\" \/>\n<meta property=\"article:published_time\" content=\"2020-04-08T09:17:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-26T11:03:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2020\/04\/ap-bl-gradiska-II.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"534\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\"},\"headline\":\"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina)\",\"datePublished\":\"2020-04-08T09:17:00+00:00\",\"dateModified\":\"2021-05-26T11:03:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/\"},\"wordCount\":244,\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ap-bl-gradiska-II.jpg\",\"articleSection\":[\"Completed Capital Projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/\",\"name\":\"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ap-bl-gradiska-II.jpg\",\"datePublished\":\"2020-04-08T09:17:00+00:00\",\"dateModified\":\"2021-05-26T11:03:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/#primaryimage\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ap-bl-gradiska-II.jpg\",\"contentUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ap-bl-gradiska-II.jpg\",\"width\":800,\"height\":534},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/izgradnja-autoputa-banja-luka-gradiska-2012\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/integral.ba\\\/en\\\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"name\":\"Integral In\u017eenjering\",\"description\":\"iic\",\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/integral.ba\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\",\"name\":\"Integral In\u017eenjering\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Integral In\u017eenjering\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/user\\\/IntegralGrupa\",\"https:\\\/\\\/sr.wikipedia.org\\\/sr-el\\\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/","og_locale":"en_US","og_type":"article","og_title":"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","og_description":"Investors: Public Company &#8220;Republic of Srpska Roads&#8221;&#8221; and Public Company &#8220;&#8221;Republic of Srpska&nbsp;Motorways&#8221;Contractor: Integral in\u017eenjering a.d. (PLC), Lakta\u0161iFinancing:&nbsp;European Bank for Reconstrucion and Development (EBRD), European Investment Bank (EIB), local funds Projects\u2019 value:&nbsp;100,0 milion EUR or 195,6 milion BAMEngineer: JV \u201eC.Lotti &amp; Associati (Italy) i IRD engineering (Italy)\u201c About the Projects:Motorway Banja Luka \u2013 Gradi\u0161ka is [&hellip;]","og_url":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/","og_site_name":"Integral In\u017eenjering","article_published_time":"2020-04-08T09:17:00+00:00","article_modified_time":"2021-05-26T11:03:46+00:00","og_image":[{"width":800,"height":534,"url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/04\/ap-bl-gradiska-II.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/#article","isPartOf":{"@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/"},"author":{"name":"admin","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5"},"headline":"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina)","datePublished":"2020-04-08T09:17:00+00:00","dateModified":"2021-05-26T11:03:46+00:00","mainEntityOfPage":{"@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/"},"wordCount":244,"publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"image":{"@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/04\/ap-bl-gradiska-II.jpg","articleSection":["Completed Capital Projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/","url":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/","name":"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","isPartOf":{"@id":"https:\/\/integral.ba\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/#primaryimage"},"image":{"@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/04\/ap-bl-gradiska-II.jpg","datePublished":"2020-04-08T09:17:00+00:00","dateModified":"2021-05-26T11:03:46+00:00","breadcrumb":{"@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/#primaryimage","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/04\/ap-bl-gradiska-II.jpg","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/04\/ap-bl-gradiska-II.jpg","width":800,"height":534},{"@type":"BreadcrumbList","@id":"https:\/\/integral.ba\/en\/izgradnja-autoputa-banja-luka-gradiska-2012\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/integral.ba\/en\/?lang=en"},{"@type":"ListItem","position":2,"name":"Construction of the Banja Luka \u2013 Gradi\u0161ka Motorway (Republic of Srpska, Bosnia and Herzegovina)"}]},{"@type":"WebSite","@id":"https:\/\/integral.ba\/en\/#website","url":"https:\/\/integral.ba\/en\/","name":"Integral In\u017eenjering","description":"iic","publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/integral.ba\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/integral.ba\/en\/#organization","name":"Integral In\u017eenjering","url":"https:\/\/integral.ba\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","width":512,"height":512,"caption":"Integral In\u017eenjering"},"image":{"@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.youtube.com\/user\/IntegralGrupa","https:\/\/sr.wikipedia.org\/sr-el\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433"]},{"@type":"Person","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/21889","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/comments?post=21889"}],"version-history":[{"count":4,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/21889\/revisions"}],"predecessor-version":[{"id":42407,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/21889\/revisions\/42407"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media\/41224"}],"wp:attachment":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media?parent=21889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/categories?post=21889"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/tags?post=21889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}