{"id":3019,"date":"2015-11-25T11:48:29","date_gmt":"2015-11-25T11:48:29","guid":{"rendered":"https:\/\/integral.ba\/?p=3019&#038;lang=en"},"modified":"2020-04-20T12:47:45","modified_gmt":"2020-04-20T10:47:45","slug":"successful-first-twelve-months-motorway-section-banja-luka-prnjavor","status":"publish","type":"post","link":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/","title":{"rendered":"Successful first twelve months (motorway section  Banja Luka \u2013 Prnjavor)"},"content":{"rendered":"<p>After the first twelve months of project beginning, we can say with pleasure that the works on construction of motorway Banja Luka \u2013 Doboj, <strong>section Banja Luka \u2013 Prnjavor<\/strong> are in progress according to the work schedule. It is about the motorway section of length of 35.3 km on which there will be constructed 52 structures, i.e. there will be constructed 20 bridges, 18 overpasses, 7 viaducts, 6 underpasses and one tunnel.<\/p>\n<p>The preliminary earthworks are intensively carried out and the filling on the whole section is performed.<\/p>\n<p><strong>The bridge of length of 340 m<\/strong> is constructed over the Vrbas river. This is the most complex structure on the motorway Banja Luka \u2013 Prnjavor and it is located on third kilometre of the motorway. The works are carried out from the left to the right side of riverbank with incremental launching method. After completion of bridge construction, the bridge will have two separate traffic lanes.<\/p>\n<p>The works on construction of the viaduct \u201cMahovljani\u201d of length of 400 m and viaduct \u201cLakta\u0161i 2\u201d of length of 450 m which are at the beginning of motorway alignment are in progress.<\/p>\n<p>The Engineer is JV \u201cKrebs + Kiefer Eastern Europe GmbH\u201d &nbsp;(Germany) and H.P. \u201cGauf &nbsp;Ingenieure \u2013 JBG\u201d (Germany).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After the first twelve months of project beginning, we can say with pleasure that the works on construction of motorway Banja Luka \u2013 Doboj, section Banja Luka \u2013 Prnjavor are in progress according to the work schedule. It is about the motorway section of length of 35.3 km on which there will be constructed 52 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2492,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-3019","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Motorway section Banja Luka \u2013 Prnjavor<\/title>\n<meta name=\"description\" content=\"Motorway Banja Luka \u2013 Doboj, section Banja Luka \u2013 Prnjavor are in progress according to the work schedule.It is about the motorway section of length...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Motorway section Banja Luka \u2013 Prnjavor\" \/>\n<meta property=\"og:description\" content=\"Motorway Banja Luka \u2013 Doboj, section Banja Luka \u2013 Prnjavor are in progress according to the work schedule.It is about the motorway section of length...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/\" \/>\n<meta property=\"og:site_name\" content=\"Integral In\u017eenjering\" \/>\n<meta property=\"article:published_time\" content=\"2015-11-25T11:48:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-04-20T10:47:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"386\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5\"},\"headline\":\"Successful first twelve months (motorway section Banja Luka \u2013 Prnjavor)\",\"datePublished\":\"2015-11-25T11:48:29+00:00\",\"dateModified\":\"2020-04-20T10:47:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/\"},\"wordCount\":205,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/integral.ba\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/\",\"url\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/\",\"name\":\"Motorway section Banja Luka \u2013 Prnjavor\",\"isPartOf\":{\"@id\":\"https:\/\/integral.ba\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg\",\"datePublished\":\"2015-11-25T11:48:29+00:00\",\"dateModified\":\"2020-04-20T10:47:45+00:00\",\"description\":\"Motorway Banja Luka \u2013 Doboj, section Banja Luka \u2013 Prnjavor are in progress according to the work schedule.It is about the motorway section of length...\",\"breadcrumb\":{\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#primaryimage\",\"url\":\"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg\",\"contentUrl\":\"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg\",\"width\":900,\"height\":386},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/integral.ba\/en\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Successful first twelve months (motorway section Banja Luka \u2013 Prnjavor)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/integral.ba\/en\/#website\",\"url\":\"https:\/\/integral.ba\/en\/\",\"name\":\"Integral In\u017eenjering\",\"description\":\"iic\",\"publisher\":{\"@id\":\"https:\/\/integral.ba\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/integral.ba\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/integral.ba\/en\/#organization\",\"name\":\"Integral In\u017eenjering\",\"url\":\"https:\/\/integral.ba\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png\",\"contentUrl\":\"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Integral In\u017eenjering\"},\"image\":{\"@id\":\"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.youtube.com\/user\/IntegralGrupa\",\"https:\/\/sr.wikipedia.org\/sr-el\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Motorway section Banja Luka \u2013 Prnjavor","description":"Motorway Banja Luka \u2013 Doboj, section Banja Luka \u2013 Prnjavor are in progress according to the work schedule.It is about the motorway section of length...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/","og_locale":"en_US","og_type":"article","og_title":"Motorway section Banja Luka \u2013 Prnjavor","og_description":"Motorway Banja Luka \u2013 Doboj, section Banja Luka \u2013 Prnjavor are in progress according to the work schedule.It is about the motorway section of length...","og_url":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/","og_site_name":"Integral In\u017eenjering","article_published_time":"2015-11-25T11:48:29+00:00","article_modified_time":"2020-04-20T10:47:45+00:00","og_image":[{"width":900,"height":386,"url":"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#article","isPartOf":{"@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/"},"author":{"name":"admin","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5"},"headline":"Successful first twelve months (motorway section Banja Luka \u2013 Prnjavor)","datePublished":"2015-11-25T11:48:29+00:00","dateModified":"2020-04-20T10:47:45+00:00","mainEntityOfPage":{"@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/"},"wordCount":205,"commentCount":0,"publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"image":{"@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/","url":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/","name":"Motorway section Banja Luka \u2013 Prnjavor","isPartOf":{"@id":"https:\/\/integral.ba\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#primaryimage"},"image":{"@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg","datePublished":"2015-11-25T11:48:29+00:00","dateModified":"2020-04-20T10:47:45+00:00","description":"Motorway Banja Luka \u2013 Doboj, section Banja Luka \u2013 Prnjavor are in progress according to the work schedule.It is about the motorway section of length...","breadcrumb":{"@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#primaryimage","url":"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2015\/11\/slike.Still001.jpg","width":900,"height":386},{"@type":"BreadcrumbList","@id":"https:\/\/integral.ba\/en\/successful-first-twelve-months-motorway-section-banja-luka-prnjavor\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/integral.ba\/en\/?lang=en"},{"@type":"ListItem","position":2,"name":"Successful first twelve months (motorway section Banja Luka \u2013 Prnjavor)"}]},{"@type":"WebSite","@id":"https:\/\/integral.ba\/en\/#website","url":"https:\/\/integral.ba\/en\/","name":"Integral In\u017eenjering","description":"iic","publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/integral.ba\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/integral.ba\/en\/#organization","name":"Integral In\u017eenjering","url":"https:\/\/integral.ba\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","width":512,"height":512,"caption":"Integral In\u017eenjering"},"image":{"@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.youtube.com\/user\/IntegralGrupa","https:\/\/sr.wikipedia.org\/sr-el\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433"]},{"@type":"Person","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/3019","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/comments?post=3019"}],"version-history":[{"count":0,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/3019\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media\/2492"}],"wp:attachment":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media?parent=3019"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/categories?post=3019"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/tags?post=3019"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}