{"id":41486,"date":"2020-11-16T09:50:30","date_gmt":"2020-11-16T08:50:30","guid":{"rendered":"https:\/\/integral.ba\/?p=41486"},"modified":"2021-05-26T12:57:44","modified_gmt":"2021-05-26T10:57:44","slug":"construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka","status":"publish","type":"post","link":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/","title":{"rendered":"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina)"},"content":{"rendered":"\n<p><strong>Investor: <\/strong>Public company \u201cRepublika Srpska Motorways\u201d d.o.o. (LLC) Banja Luka<br><strong>Contractor: <\/strong>Integral in\u017eenjering a.d. (PLC) Lakta\u0161i<br><strong>Value of works:<\/strong> 12.2 million BAM or 6.2 million EUR<br><strong>Funding: <\/strong>Local funds<\/p>\n\n\n\n<p><strong>General information on the project:<\/strong><strong><\/strong><\/p>\n\n\n\n<p>The works on construction of road connecting the main road M16 Banja Luka \u2013 Gradi\u0161ka with the motorway E661 Gradi\u0161ka \u2013 Banja Luka, on the route Brestov\u010dina \u2013 \u010catrnja, began in October 2014 and have not been completed yet. <strong><em>NOTE<\/em><\/strong><em>: The construction works were contracted to the other construction company<\/em>. In the meantime, the border crossing point and the new customs terminal on the motorway were constructed, while at the beginning of 2022, the works on the construction of the bridge over the Sava River are expected to be completed. The construction of a connecting road (bypass) around Gradi\u0161ka will relieve the traffic through Gradi\u0161ka and settlements in the municipality, while a new development belt and area for the expansion of the city will be formed.<\/p>\n\n\n\n<p><strong>Scope of works:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>construction of section of main road in total length of 5.15 km, with complete dewatering system;<\/li><li>construction of roundabout;<\/li><li>construction of bicycle path in total length of 3.95 km and<\/li><li>installation of traffic signalization and equipment on the whole section.<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Investor: Public company \u201cRepublika Srpska Motorways\u201d d.o.o. (LLC) Banja LukaContractor: Integral in\u017eenjering a.d. (PLC) Lakta\u0161iValue of works: 12.2 million BAM or 6.2 million EURFunding: Local funds General information on the project: The works on construction of road connecting the main road M16 Banja Luka \u2013 Gradi\u0161ka with the motorway E661 Gradi\u0161ka \u2013 Banja Luka, on [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-41486","post","type-post","status-publish","format-standard","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering\" \/>\n<meta property=\"og:description\" content=\"Investor: Public company \u201cRepublika Srpska Motorways\u201d d.o.o. (LLC) Banja LukaContractor: Integral in\u017eenjering a.d. (PLC) Lakta\u0161iValue of works: 12.2 million BAM or 6.2 million EURFunding: Local funds General information on the project: The works on construction of road connecting the main road M16 Banja Luka \u2013 Gradi\u0161ka with the motorway E661 Gradi\u0161ka \u2013 Banja Luka, on [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/\" \/>\n<meta property=\"og:site_name\" content=\"Integral In\u017eenjering\" \/>\n<meta property=\"article:published_time\" content=\"2020-11-16T08:50:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-26T10:57:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/iic-vladicin-han.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\"},\"headline\":\"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina)\",\"datePublished\":\"2020-11-16T08:50:30+00:00\",\"dateModified\":\"2021-05-26T10:57:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\\\/\"},\"wordCount\":235,\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\\\/\",\"name\":\"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\"},\"datePublished\":\"2020-11-16T08:50:30+00:00\",\"dateModified\":\"2021-05-26T10:57:44+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/integral.ba\\\/en\\\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/integral.ba\\\/en\\\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"name\":\"Integral In\u017eenjering\",\"description\":\"iic\",\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/integral.ba\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\",\"name\":\"Integral In\u017eenjering\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Integral In\u017eenjering\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/user\\\/IntegralGrupa\",\"https:\\\/\\\/sr.wikipedia.org\\\/sr-el\\\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/","og_locale":"en_US","og_type":"article","og_title":"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","og_description":"Investor: Public company \u201cRepublika Srpska Motorways\u201d d.o.o. (LLC) Banja LukaContractor: Integral in\u017eenjering a.d. (PLC) Lakta\u0161iValue of works: 12.2 million BAM or 6.2 million EURFunding: Local funds General information on the project: The works on construction of road connecting the main road M16 Banja Luka \u2013 Gradi\u0161ka with the motorway E661 Gradi\u0161ka \u2013 Banja Luka, on [&hellip;]","og_url":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/","og_site_name":"Integral In\u017eenjering","article_published_time":"2020-11-16T08:50:30+00:00","article_modified_time":"2021-05-26T10:57:44+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/iic-vladicin-han.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/#article","isPartOf":{"@id":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/"},"author":{"name":"admin","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5"},"headline":"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina)","datePublished":"2020-11-16T08:50:30+00:00","dateModified":"2021-05-26T10:57:44+00:00","mainEntityOfPage":{"@id":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/"},"wordCount":235,"publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/","url":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/","name":"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","isPartOf":{"@id":"https:\/\/integral.ba\/en\/#website"},"datePublished":"2020-11-16T08:50:30+00:00","dateModified":"2021-05-26T10:57:44+00:00","breadcrumb":{"@id":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/integral.ba\/en\/construction-of-road-access-to-border-crossing-point-customs-terminal-and-new-bridge-over-the-river-sava-up-to-motorway-e661-gradiska-banja-luka\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/integral.ba\/en\/?lang=en"},{"@type":"ListItem","position":2,"name":"Construction of road access to border crossing point, customs terminal and new bridge over the river Sava up to motorway E661 Gradi\u0161ka \u2013 Banja Luka (Republic of Srpska, Bosnia and Herzegovina)"}]},{"@type":"WebSite","@id":"https:\/\/integral.ba\/en\/#website","url":"https:\/\/integral.ba\/en\/","name":"Integral In\u017eenjering","description":"iic","publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/integral.ba\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/integral.ba\/en\/#organization","name":"Integral In\u017eenjering","url":"https:\/\/integral.ba\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","width":512,"height":512,"caption":"Integral In\u017eenjering"},"image":{"@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.youtube.com\/user\/IntegralGrupa","https:\/\/sr.wikipedia.org\/sr-el\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433"]},{"@type":"Person","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/41486","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/comments?post=41486"}],"version-history":[{"count":8,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/41486\/revisions"}],"predecessor-version":[{"id":42404,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/41486\/revisions\/42404"}],"wp:attachment":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media?parent=41486"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/categories?post=41486"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/tags?post=41486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}