{"id":41573,"date":"2020-11-13T14:00:00","date_gmt":"2020-11-13T13:00:00","guid":{"rendered":"https:\/\/integral.ba\/?p=41573"},"modified":"2020-11-16T15:05:48","modified_gmt":"2020-11-16T14:05:48","slug":"bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works","status":"publish","type":"post","link":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/","title":{"rendered":"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works"},"content":{"rendered":"\n<p>The commencement of works on construction of the bridge over the Trebi\u0161njica River, representing the biggest structure on the future eastern bypass around Trebinje and, at the same time, the biggest bridge in the city, was marked with a special ceremony held on November 12, 2020.<strong><\/strong><\/p>\n\n\n\n<p>The ceremonial start of works was attended by:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Luka Petrovi\u0107, director of the company \u201cElektroprivreda Republike Srpske\u201d;<\/li><li>Gordan Mi\u0161elji\u0107, director of the company \u201cHidroelektrane na Trebi\u0161njici;<\/li><li>Davor Kostre\u0161evi\u0107, director of the company \u201cPutevi Republike Srpske\u201d;<\/li><li>Mirko \u0106uri\u0107, the Mayor of the City of Trebinje with his associates;<\/li><li>representatives of the company \u201cIntegral In\u017eenjering\u201d a.d. (PLC), the Contractor;<\/li><li>representatives of political and public life.<\/li><\/ul>\n\n\n\n<p>In their addresses, senior officials pointed out that the construction of the eastern bypass was a long-awaited project, from which the city of Trebinje would benefit in many ways. A new zone for the construction of business facilities is being created, and the relocation of transit traffic from the city center will enable the formation of a pedestrian zone. In addition to already completed projects, this is one of the most significant investments in road infrastructure in the region.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button btn_l\"><a class=\"wp-block-button__link\" href=\"https:\/\/lat.rtrs.tv\/vijesti\/vijest.php?id=409120\" target=\"_blank\" rel=\"noreferrer noopener\">More about official statements&#8230;<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<p>The main span structure of the bridge is a monolithic reinforced concrete pre-stressed structure over 13 spans. The designed length of the bridge is L=484 m, and the width is Bv=11.60 m. The span structure of the bridge is made using the technology of incremental launching.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button btn_l\"><a class=\"wp-block-button__link\" href=\"https:\/\/integral.ba\/izgradnja-mosta-preko-rijeke-trebisnjice-u-trebinju\/?lang=en\">More about the project&#8230;<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<p>The company \u201cIntegral In\u017eenjering\u201d a.d. (PLC) Lakta\u0161i has significant longtime experience in bridge construction, which is a guarantee that this project will be realized equally successfully.<\/p>\n\n\n\n<p>Some of the most significant bridges constructed by the company \u201cIntegral In\u017eenjering\u201d a.d. (PLC) Lakta\u0161i together with its partners, are the following:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>seven bridges on the motorway in the Grdelica gorge (Vladi\u010din Han, Serbia) with a total length of l = 2,540 m (2018);<\/li><li>bridge on the motorway over the Vrbas river (Lakta\u0161i) with a total length l = 340 m (2017);<\/li><li>viaduct on the motorway in Lakta\u0161i, length l = 449 m (2017);<\/li><li>viaduct on the motorway in Mahovljani (Lakta\u0161i), length l = 400 m (2017);<\/li><li>bridge on the motorway over the Bosna river (Doboj), length l = 414 m (2016);<\/li><li>Trnova Luka viaduct (\u010cemerno, Gacko), length l = 408 m (2013).<\/li><\/ul>\n\n\n\n<p>In addition to the bridge on the Trebi\u0161njica river, the company \u201cIntegral In\u017eenjering\u201d a.d. (PLC) Lakta\u0161i constructs three other large bridges:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>bridge over the Sava river near Gradi\u0161ka (l = 462 m);<\/li><li>bridge over the Bosna river on the motorway on Corridor 5c near Doboj (l = 228 m) and<\/li><li>bridge over the Vrbas river in Banja Luka (l = 80 m).<\/li><\/ul>\n\n\n\n<p>With the total annual income in 2019 in the amount of 222.7 million BAM (113.8 million EUR), the company \u201cIntegral In\u017eenjering\u201d a.d. (PLC) Lakta\u0161i is the largest construction company in Bosnia and Herzegovina, and the leader in the region. In addition, with the total export revenue of 153.1 million KM (78.28 million Euros) in 2019, the company \u201cIntegral In\u017eenjering\u201d a.d. (PLC) Lakta\u0161i is the largest exporter in the construction sector and the fourth largest exporter from Bosnia and Herzegovina.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The commencement of works on construction of the bridge over the Trebi\u0161njica River, representing the biggest structure on the future eastern bypass around Trebinje and, at the same time, the biggest bridge in the city, was marked with a special ceremony held on November 12, 2020. The ceremonial start of works was attended by: Luka [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":41505,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-41573","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works - Integral In\u017eenjering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works - Integral In\u017eenjering\" \/>\n<meta property=\"og:description\" content=\"The commencement of works on construction of the bridge over the Trebi\u0161njica River, representing the biggest structure on the future eastern bypass around Trebinje and, at the same time, the biggest bridge in the city, was marked with a special ceremony held on November 12, 2020. The ceremonial start of works was attended by: Luka [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/\" \/>\n<meta property=\"og:site_name\" content=\"Integral In\u017eenjering\" \/>\n<meta property=\"article:published_time\" content=\"2020-11-13T13:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-11-16T14:05:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2020\/11\/most-trebisnjica.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"540\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\"},\"headline\":\"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works\",\"datePublished\":\"2020-11-13T13:00:00+00:00\",\"dateModified\":\"2020-11-16T14:05:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/\"},\"wordCount\":528,\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/most-trebisnjica.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/\",\"name\":\"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works - Integral In\u017eenjering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/most-trebisnjica.jpg\",\"datePublished\":\"2020-11-13T13:00:00+00:00\",\"dateModified\":\"2020-11-16T14:05:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/#primaryimage\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/most-trebisnjica.jpg\",\"contentUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/most-trebisnjica.jpg\",\"width\":720,\"height\":540,\"caption\":\"T\u0420\u0415\u0411\u0418\u040a\u0415, 12. \u041d\u041e\u0412\u0415\u041c\u0411\u0420\u0410 \\\/\u0421\u0420\u041d\u0410\\\/ - \u0423 T\u0440\u0435\u0431\u0438\u045a\u0443 \u0458\u0435 \u0434\u0430\u043d\u0430\u0441 \u043e\u0437\u0432\u0430\u043d\u0438\u0447\u0435\u043d \u043f\u043e\u0447\u0435\u0442\u0430\u043a \u0440\u0430\u0434\u043e\u0432\u0430 \u043d\u0430 \u0438\u0437\u0433\u0440\u0430\u0434\u045a\u0438 \u043c\u043e\u0441\u0442\u0430 \u043d\u0430 \u0440\u0438\u0458\u0435\u0446\u0438 T\u0440\u0435\u0431\u0438\u0448\u045a\u0438\u0446\u0438, \u043a\u043e\u0458\u0438 \u0441\u0435 \u0433\u0440\u0430\u0434\u0438 \u0443 \u043e\u043a\u0432\u0438\u0440\u0443 \u043f\u0440\u043e\u0458\u0435\u043a\u0442\u0430 \u0432\u0435\u043b\u0438\u043a\u0435 \u043e\u0431\u0438\u043b\u0430\u0437\u043d\u0438\u0446\u0435, \u0430 \u0432\u0440\u0438\u0458\u0435\u0434\u043d\u043e\u0441\u0442 \u0440\u0430\u0434\u043e\u0432\u0430 \u0438\u0437\u0433\u0440\u0430\u0434\u045a\u0435 \u043c\u043e\u0441\u0442\u0430 \u043a\u043e\u0458\u0435 \u0444\u0438\u043d\u0430\u043d\u0441\u0438\u0440\u0430 \u043f\u0440\u0435\u0434\u0443\u0437\u0435\u045b\u0435 \\\"\u0425\u0438\u0434\u0440\u043e\u0435\u043b\u0435\u043a\u0442\u0440\u0430\u043d\u0435 \u043d\u0430 T\u0440\u0435\u0431\u0438\u0448\u045a\u0438\u0446\u0438\\\" \u0458\u0435 12 \u043c\u0438\u043b\u0438\u043e\u043d\u0430 \u041a\u041c \u0441\u0430 \u043f\u0434\u0432-\u043e\u043c.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/integral.ba\\\/en\\\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"name\":\"Integral In\u017eenjering\",\"description\":\"iic\",\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/integral.ba\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\",\"name\":\"Integral In\u017eenjering\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Integral In\u017eenjering\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/user\\\/IntegralGrupa\",\"https:\\\/\\\/sr.wikipedia.org\\\/sr-el\\\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works - Integral In\u017eenjering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/","og_locale":"en_US","og_type":"article","og_title":"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works - Integral In\u017eenjering","og_description":"The commencement of works on construction of the bridge over the Trebi\u0161njica River, representing the biggest structure on the future eastern bypass around Trebinje and, at the same time, the biggest bridge in the city, was marked with a special ceremony held on November 12, 2020. The ceremonial start of works was attended by: Luka [&hellip;]","og_url":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/","og_site_name":"Integral In\u017eenjering","article_published_time":"2020-11-13T13:00:00+00:00","article_modified_time":"2020-11-16T14:05:48+00:00","og_image":[{"width":720,"height":540,"url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/11\/most-trebisnjica.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/#article","isPartOf":{"@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/"},"author":{"name":"admin","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5"},"headline":"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works","datePublished":"2020-11-13T13:00:00+00:00","dateModified":"2020-11-16T14:05:48+00:00","mainEntityOfPage":{"@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/"},"wordCount":528,"publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"image":{"@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/11\/most-trebisnjica.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/","url":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/","name":"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works - Integral In\u017eenjering","isPartOf":{"@id":"https:\/\/integral.ba\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/#primaryimage"},"image":{"@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/11\/most-trebisnjica.jpg","datePublished":"2020-11-13T13:00:00+00:00","dateModified":"2020-11-16T14:05:48+00:00","breadcrumb":{"@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/#primaryimage","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/11\/most-trebisnjica.jpg","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/11\/most-trebisnjica.jpg","width":720,"height":540,"caption":"T\u0420\u0415\u0411\u0418\u040a\u0415, 12. \u041d\u041e\u0412\u0415\u041c\u0411\u0420\u0410 \/\u0421\u0420\u041d\u0410\/ - \u0423 T\u0440\u0435\u0431\u0438\u045a\u0443 \u0458\u0435 \u0434\u0430\u043d\u0430\u0441 \u043e\u0437\u0432\u0430\u043d\u0438\u0447\u0435\u043d \u043f\u043e\u0447\u0435\u0442\u0430\u043a \u0440\u0430\u0434\u043e\u0432\u0430 \u043d\u0430 \u0438\u0437\u0433\u0440\u0430\u0434\u045a\u0438 \u043c\u043e\u0441\u0442\u0430 \u043d\u0430 \u0440\u0438\u0458\u0435\u0446\u0438 T\u0440\u0435\u0431\u0438\u0448\u045a\u0438\u0446\u0438, \u043a\u043e\u0458\u0438 \u0441\u0435 \u0433\u0440\u0430\u0434\u0438 \u0443 \u043e\u043a\u0432\u0438\u0440\u0443 \u043f\u0440\u043e\u0458\u0435\u043a\u0442\u0430 \u0432\u0435\u043b\u0438\u043a\u0435 \u043e\u0431\u0438\u043b\u0430\u0437\u043d\u0438\u0446\u0435, \u0430 \u0432\u0440\u0438\u0458\u0435\u0434\u043d\u043e\u0441\u0442 \u0440\u0430\u0434\u043e\u0432\u0430 \u0438\u0437\u0433\u0440\u0430\u0434\u045a\u0435 \u043c\u043e\u0441\u0442\u0430 \u043a\u043e\u0458\u0435 \u0444\u0438\u043d\u0430\u043d\u0441\u0438\u0440\u0430 \u043f\u0440\u0435\u0434\u0443\u0437\u0435\u045b\u0435 \"\u0425\u0438\u0434\u0440\u043e\u0435\u043b\u0435\u043a\u0442\u0440\u0430\u043d\u0435 \u043d\u0430 T\u0440\u0435\u0431\u0438\u0448\u045a\u0438\u0446\u0438\" \u0458\u0435 12 \u043c\u0438\u043b\u0438\u043e\u043d\u0430 \u041a\u041c \u0441\u0430 \u043f\u0434\u0432-\u043e\u043c."},{"@type":"BreadcrumbList","@id":"https:\/\/integral.ba\/en\/bridge-over-the-trebisnjica-river-in-trebinje-ceremonial-commencement-of-works\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/integral.ba\/en\/?lang=en"},{"@type":"ListItem","position":2,"name":"Bridge over the Trebi\u0161njica river in Trebinje: Ceremonial commencement of works"}]},{"@type":"WebSite","@id":"https:\/\/integral.ba\/en\/#website","url":"https:\/\/integral.ba\/en\/","name":"Integral In\u017eenjering","description":"iic","publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/integral.ba\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/integral.ba\/en\/#organization","name":"Integral In\u017eenjering","url":"https:\/\/integral.ba\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","width":512,"height":512,"caption":"Integral In\u017eenjering"},"image":{"@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.youtube.com\/user\/IntegralGrupa","https:\/\/sr.wikipedia.org\/sr-el\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433"]},{"@type":"Person","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/41573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/comments?post=41573"}],"version-history":[{"count":2,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/41573\/revisions"}],"predecessor-version":[{"id":41577,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/41573\/revisions\/41577"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media\/41505"}],"wp:attachment":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media?parent=41573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/categories?post=41573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/tags?post=41573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}