{"id":42273,"date":"2021-04-29T12:49:00","date_gmt":"2021-04-29T10:49:00","guid":{"rendered":"https:\/\/integral.ba\/?p=42273"},"modified":"2021-05-24T13:44:42","modified_gmt":"2021-05-24T11:44:42","slug":"potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj","status":"publish","type":"post","link":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/","title":{"rendered":"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed"},"content":{"rendered":"\n<p>The contract for the design and construction of the second section of motorway on Corridor Vc in the Republika Srpska was solemnly signed in the premises of the Government of the Republika Srpska on April 29, 2021.<\/p>\n\n\n\n<p>The contract was signed by the director of the company \u201cIntegral in\u017eenjering\u201d a.d. (JSC), Slobodan Stankovi\u0107, on behalf of the Contractor, and the director of the company \u201cAutoputevi Republike Srpske\u201d, Du\u0161an Topi\u0107, and the acting executive director for technical affairs of this company, Milenko Daki\u0107, on behalf of the Employer. The signing ceremony was attended by the Prime Minister of the Republika Srpska, Radovan Vi\u0161kovi\u0107, and the Minister of Transport and Communications of Srpska, Nedeljko \u0106ori\u0107.<\/p>\n\n\n\n<p>It is about the design and construction of the motorway on Corridor Vc in the Republika Srpska on the section where the motorway bypasses the city of Doboj and connects part of the motorway in the Federation of Bosnia and Herzegovina. This is the second section that the company \u201cIntegral in\u017eenjering\u201d a.d. (JSC) currently constructs on Corridor Vc in the Republika Srpska next to the Johovac (Tovira) \u2013 Rudanka (Kostajnica) section.<\/p>\n\n\n\n<p>The contract covers the design and construction of 5.6 km of new motorway together with all connected local roads and the following main structures:<\/p>\n\n\n\n<p>\u2022 Double pipe tunnel \u201cPutnikovo brdo 1\u201d in the total length of 1.6 km<br>\u2022 Double pipe tunnel \u201cPutnikovo brdo 2\u201d in the total length of 700 m<br>\u2022 Bridge \u201cRudanka\u201d over the river Bosna in the total length of 326 m<br>\u2022 Viaduct \u201cPutnikovo brdo\u201d in the total length of 288 m<br>\u2022 Overpass \u201cPrisade\u201d in the total length of 94.20 m<\/p>\n\n\n\n<p>The project includes the design and construction of retaining walls and structures for the protection of slopes, modern telecommunications installations for traffic management on the motorway, works on the installation of traffic signalization and equipment, installation of noise protection structures, works on motorway drainage and river regulation, relocation of electrical installation, and lighting installations.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>The value of works without VAT is: KM 183.2 million (EUR 93.7 million).<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery columns-3 is-cropped essgrid-gallery-galerija wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" src=\"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4717.jpg\" alt=\"\" data-id=\"42277\" class=\"wp-image-42278\" srcset=\"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4717.jpg 1600w, https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4717-1280x960.jpg 1280w, https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4717-980x735.jpg 980w, https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4717-480x360.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1600px, 100vw\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" src=\"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4712.jpg\" alt=\"\" data-id=\"42281\" class=\"wp-image-42282\" srcset=\"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4712.jpg 1600w, https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4712-1280x960.jpg 1280w, https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4712-980x735.jpg 980w, https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4712-480x360.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1600px, 100vw\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"1600\" src=\"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4710.jpg\" alt=\"\" data-id=\"42283\" class=\"wp-image-42284\" srcset=\"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4710.jpg 1200w, https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4710-980x1307.jpg 980w, https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/IMG_4710-480x640.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1200px, 100vw\" \/><\/figure><\/li><\/ul><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The contract for the design and construction of the second section of motorway on Corridor Vc in the Republika Srpska was solemnly signed in the premises of the Government of the Republika Srpska on April 29, 2021. The contract was signed by the director of the company \u201cIntegral in\u017eenjering\u201d a.d. (JSC), Slobodan Stankovi\u0107, on behalf [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":42276,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-42273","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed - Integral In\u017eenjering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed - Integral In\u017eenjering\" \/>\n<meta property=\"og:description\" content=\"The contract for the design and construction of the second section of motorway on Corridor Vc in the Republika Srpska was solemnly signed in the premises of the Government of the Republika Srpska on April 29, 2021. The contract was signed by the director of the company \u201cIntegral in\u017eenjering\u201d a.d. (JSC), Slobodan Stankovi\u0107, on behalf [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/\" \/>\n<meta property=\"og:site_name\" content=\"Integral In\u017eenjering\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-29T10:49:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-24T11:44:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/5c-potpisivanjeUgovora.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"724\" \/>\n\t<meta property=\"og:image:height\" content=\"519\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\"},\"headline\":\"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed\",\"datePublished\":\"2021-04-29T10:49:00+00:00\",\"dateModified\":\"2021-05-24T11:44:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/\"},\"wordCount\":346,\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/5c-potpisivanjeUgovora.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/\",\"name\":\"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed - Integral In\u017eenjering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/5c-potpisivanjeUgovora.jpg\",\"datePublished\":\"2021-04-29T10:49:00+00:00\",\"dateModified\":\"2021-05-24T11:44:42+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/#primaryimage\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/5c-potpisivanjeUgovora.jpg\",\"contentUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/5c-potpisivanjeUgovora.jpg\",\"width\":724,\"height\":519},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/integral.ba\\\/en\\\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"name\":\"Integral In\u017eenjering\",\"description\":\"iic\",\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/integral.ba\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\",\"name\":\"Integral In\u017eenjering\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Integral In\u017eenjering\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/user\\\/IntegralGrupa\",\"https:\\\/\\\/sr.wikipedia.org\\\/sr-el\\\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed - Integral In\u017eenjering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/","og_locale":"en_US","og_type":"article","og_title":"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed - Integral In\u017eenjering","og_description":"The contract for the design and construction of the second section of motorway on Corridor Vc in the Republika Srpska was solemnly signed in the premises of the Government of the Republika Srpska on April 29, 2021. The contract was signed by the director of the company \u201cIntegral in\u017eenjering\u201d a.d. (JSC), Slobodan Stankovi\u0107, on behalf [&hellip;]","og_url":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/","og_site_name":"Integral In\u017eenjering","article_published_time":"2021-04-29T10:49:00+00:00","article_modified_time":"2021-05-24T11:44:42+00:00","og_image":[{"width":724,"height":519,"url":"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/5c-potpisivanjeUgovora.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/#article","isPartOf":{"@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/"},"author":{"name":"admin","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5"},"headline":"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed","datePublished":"2021-04-29T10:49:00+00:00","dateModified":"2021-05-24T11:44:42+00:00","mainEntityOfPage":{"@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/"},"wordCount":346,"publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"image":{"@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/5c-potpisivanjeUgovora.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/","url":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/","name":"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed - Integral In\u017eenjering","isPartOf":{"@id":"https:\/\/integral.ba\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/#primaryimage"},"image":{"@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/5c-potpisivanjeUgovora.jpg","datePublished":"2021-04-29T10:49:00+00:00","dateModified":"2021-05-24T11:44:42+00:00","breadcrumb":{"@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/#primaryimage","url":"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/5c-potpisivanjeUgovora.jpg","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2021\/04\/5c-potpisivanjeUgovora.jpg","width":724,"height":519},{"@type":"BreadcrumbList","@id":"https:\/\/integral.ba\/en\/potpisan-ugovor-o-projektovanju-i-izgradnji-56-km-novog-autoputa-na-koridoru-5c-u-republici-srpskoj\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/integral.ba\/en\/?lang=en"},{"@type":"ListItem","position":2,"name":"Contract for the design and construction of 5.6 km of motorway on Corridor Vc in the Republika Srpska (Doboj bypass) signed"}]},{"@type":"WebSite","@id":"https:\/\/integral.ba\/en\/#website","url":"https:\/\/integral.ba\/en\/","name":"Integral In\u017eenjering","description":"iic","publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/integral.ba\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/integral.ba\/en\/#organization","name":"Integral In\u017eenjering","url":"https:\/\/integral.ba\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","width":512,"height":512,"caption":"Integral In\u017eenjering"},"image":{"@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.youtube.com\/user\/IntegralGrupa","https:\/\/sr.wikipedia.org\/sr-el\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433"]},{"@type":"Person","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/42273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/comments?post=42273"}],"version-history":[{"count":4,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/42273\/revisions"}],"predecessor-version":[{"id":42340,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/42273\/revisions\/42340"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media\/42276"}],"wp:attachment":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media?parent=42273"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/categories?post=42273"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/tags?post=42273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}