{"id":6299,"date":"2018-09-21T13:32:10","date_gmt":"2018-09-21T11:32:10","guid":{"rendered":"https:\/\/integral.ba\/?p=6299"},"modified":"2020-04-15T14:54:43","modified_gmt":"2020-04-15T12:54:43","slug":"zavrsena-izgradnja-kanala-kroz-fatnicko-polje","status":"publish","type":"post","link":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/","title":{"rendered":"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED"},"content":{"rendered":"\n<p>The works on construction of canal through Fatni\u010dko polje was successfully completed on Novemebr 08, 2018.<\/p>\n\n\n\n<p>An open channel through Fatni\u010dko polje is a hydrotechnical structure in the hydroelectric system Gornji Horizonti in the Trebisnjica River Basin. The canal connects already built tunnel Dabars field \u2013 Fatni\u010dko field and tunnel Fatni\u010dko field \u2013 accumulation of Bile\u0107a. It is intended for the convey water without losses between future HPP Dabar and HPP Bile\u0107a. The water that is being processed in the HPP Bile\u0107a will be introduced into the accumulation of \u201cBile\u0107a\u201c and it will continue to be used in the existing HPP Trebinje I, HPP Trebinje II, HPP Dubrovnik and PHE \u010capljina \u2013 they have been successively operating since 1965 (HPP Dubrovnik) until 1981 (HPP Trebinje II). In this way, the production of electricity in these hydroelectric power plants will be significantly increased.<\/p>\n\n\n\n<p><strong>Basic data of the Project:<\/strong><\/p>\n\n\n\n<p><strong>Investor:<\/strong>\u00a0Mixed Holding \u201cElectric Power Distribution of the Republika Srpska\u201c \u2013 Joint ownership enetrprise a.d. (PLC) Trebinje Subsidiary Company \u201cHydro Power Plants on Trebi\u0161njica\u201c a.d. (PLC) Trebinje<br><strong>Engineer:<\/strong> \u201cElectric Power Distribution of the Republika Srpska\u201c \u2013 Joint ownership enetrprise a.d. (PLC) Trebinje<br><strong>Contractor:<\/strong> Consortium \u201cIntegral In\u017eenjering\u201c a.d. (PLC) Lakta\u0161i i \u201cPrijedorputevi\u201c a.d. (PLC) Prijedor<br><strong>Value:<\/strong>\u00a08 million BAM or 4.1 m EUR<\/p>\n\n\n\n<p><strong>Brief summary and work description:<\/strong><\/p>\n\n\n\n<p>Construction of the canal through Fatni\u010dko field is executed in two sections.<\/p>\n\n\n\n<p><strong>Section 1 (l =2,086 m):<\/strong><\/p>\n\n\n\n<p>Cross-section of the canal is a trapezoidal canal with bottom width of 10 m and slope inclination of 1:1.5. Reinforced concrete MB30 lining of thickness of 20 cm is performed in sections of length of 5 m. Section is dimensioned on the flow <strong>Qmax=121,50 m<sup>3<\/sup>\/s<\/strong>, which is the maximum capacity of the tunnel Fatnica \u2013 Bile\u0107a.<\/p>\n\n\n\n<p><strong>Section 2 (l = 491 m):<\/strong><\/p>\n\n\n\n<p>Cross-section of the canal is a trapezoidal canal with bottom width of 10 m and slope inclination of 1:1.5. Reinforced concrete MB30 lining of thickness of 20 cm is performed in sections of length of 5 m. Section is dimensioned on the flow <strong>Qmax=93,00 m3\/s.<\/strong><\/p>\n\n\n\n<p>On the chainage 2+752,23 km, canal is over concrete sill of spillway connected with the exit of tunnel Dabar \u2013 Fatnica. The spillway length is 26 m, with initial transitional section of length of 8 m. Its width on the bottom is 5 m, and inclinations of lateral sides are 1.7:1.<\/p>\n\n\n\n<p>The bridge span of 27.40 m is constructed over the canal in this section.<\/p>\n\n\n\n<p><\/p>\n\n\n","protected":false},"excerpt":{"rendered":"<p>The works on construction of canal through Fatni\u010dko polje was successfully completed on Novemebr 08, 2018. An open channel through Fatni\u010dko polje is a hydrotechnical structure in the hydroelectric system Gornji Horizonti in the Trebisnjica River Basin. The canal connects already built tunnel Dabars field \u2013 Fatni\u010dko field and tunnel Fatni\u010dko field \u2013 accumulation of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":6315,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-6299","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED - Integral In\u017eenjering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED - Integral In\u017eenjering\" \/>\n<meta property=\"og:description\" content=\"The works on construction of canal through Fatni\u010dko polje was successfully completed on Novemebr 08, 2018. An open channel through Fatni\u010dko polje is a hydrotechnical structure in the hydroelectric system Gornji Horizonti in the Trebisnjica River Basin. The canal connects already built tunnel Dabars field \u2013 Fatni\u010dko field and tunnel Fatni\u010dko field \u2013 accumulation of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/\" \/>\n<meta property=\"og:site_name\" content=\"Integral In\u017eenjering\" \/>\n<meta property=\"article:published_time\" content=\"2018-09-21T11:32:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-04-15T12:54:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"394\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5\"},\"headline\":\"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED\",\"datePublished\":\"2018-09-21T11:32:10+00:00\",\"dateModified\":\"2020-04-15T12:54:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/\"},\"wordCount\":400,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/integral.ba\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/\",\"url\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/\",\"name\":\"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED - Integral In\u017eenjering\",\"isPartOf\":{\"@id\":\"https:\/\/integral.ba\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg\",\"datePublished\":\"2018-09-21T11:32:10+00:00\",\"dateModified\":\"2020-04-15T12:54:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#primaryimage\",\"url\":\"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg\",\"contentUrl\":\"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg\",\"width\":900,\"height\":394},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/integral.ba\/en\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/integral.ba\/en\/#website\",\"url\":\"https:\/\/integral.ba\/en\/\",\"name\":\"Integral In\u017eenjering\",\"description\":\"iic\",\"publisher\":{\"@id\":\"https:\/\/integral.ba\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/integral.ba\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/integral.ba\/en\/#organization\",\"name\":\"Integral In\u017eenjering\",\"url\":\"https:\/\/integral.ba\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png\",\"contentUrl\":\"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Integral In\u017eenjering\"},\"image\":{\"@id\":\"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.youtube.com\/user\/IntegralGrupa\",\"https:\/\/sr.wikipedia.org\/sr-el\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED - Integral In\u017eenjering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/","og_locale":"en_US","og_type":"article","og_title":"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED - Integral In\u017eenjering","og_description":"The works on construction of canal through Fatni\u010dko polje was successfully completed on Novemebr 08, 2018. An open channel through Fatni\u010dko polje is a hydrotechnical structure in the hydroelectric system Gornji Horizonti in the Trebisnjica River Basin. The canal connects already built tunnel Dabars field \u2013 Fatni\u010dko field and tunnel Fatni\u010dko field \u2013 accumulation of [&hellip;]","og_url":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/","og_site_name":"Integral In\u017eenjering","article_published_time":"2018-09-21T11:32:10+00:00","article_modified_time":"2020-04-15T12:54:43+00:00","og_image":[{"width":900,"height":394,"url":"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#article","isPartOf":{"@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/"},"author":{"name":"admin","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5"},"headline":"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED","datePublished":"2018-09-21T11:32:10+00:00","dateModified":"2020-04-15T12:54:43+00:00","mainEntityOfPage":{"@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/"},"wordCount":400,"commentCount":0,"publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"image":{"@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/","url":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/","name":"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED - Integral In\u017eenjering","isPartOf":{"@id":"https:\/\/integral.ba\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#primaryimage"},"image":{"@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg","datePublished":"2018-09-21T11:32:10+00:00","dateModified":"2020-04-15T12:54:43+00:00","breadcrumb":{"@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#primaryimage","url":"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2018\/11\/3.jpg","width":900,"height":394},{"@type":"BreadcrumbList","@id":"https:\/\/integral.ba\/en\/zavrsena-izgradnja-kanala-kroz-fatnicko-polje\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/integral.ba\/en\/?lang=en"},{"@type":"ListItem","position":2,"name":"CONSTRUCTION OF THE CANAL THROUGH FATNI\u010cKO FIELD COMPLETED"}]},{"@type":"WebSite","@id":"https:\/\/integral.ba\/en\/#website","url":"https:\/\/integral.ba\/en\/","name":"Integral In\u017eenjering","description":"iic","publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/integral.ba\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/integral.ba\/en\/#organization","name":"Integral In\u017eenjering","url":"https:\/\/integral.ba\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","width":512,"height":512,"caption":"Integral In\u017eenjering"},"image":{"@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.youtube.com\/user\/IntegralGrupa","https:\/\/sr.wikipedia.org\/sr-el\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433"]},{"@type":"Person","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/6299","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/comments?post=6299"}],"version-history":[{"count":0,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/6299\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media\/6315"}],"wp:attachment":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media?parent=6299"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/categories?post=6299"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/tags?post=6299"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}