{"id":84458,"date":"2020-04-07T09:02:00","date_gmt":"2020-04-07T07:02:00","guid":{"rendered":"https:\/\/integral.ba\/?p=84458"},"modified":"2022-02-24T15:02:28","modified_gmt":"2022-02-24T14:02:28","slug":"the-dabar-hpp-and-investigation-and-design-works","status":"publish","type":"post","link":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/","title":{"rendered":"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina)"},"content":{"rendered":"\n<p><strong>Investor:<\/strong>&nbsp;HPP \u201cDabar\u201d Ltd, Trebinje<br><strong>Contract Number:<\/strong>434-18\/16, our ref. 287\/16<br><strong>Value of works:&nbsp;<\/strong>67 m EUR (131 m BAM)<\/p>\n\n\n\n<p><strong>Broader context of the Project:<\/strong><br>The design of using of hydro system Trebi\u0161njica is based on the construction of several hydro technical structures (dams, accumulations, open channels, tunnels and hydro power plants) with which water from karst fields of East Herzegovina is used for irrigation, control of floods and production of electricity. The construction of 7 hydro power plants and 6 accumulation basins in the system is planned to be constructed for production of electricity.<br>Four hydro power plants, which use water from \u201cBile\u0107a\u201d accumulation basin are constructed up to now: HPP Trebinje I, HPP Trebinje II, HPP Dubrovnik and HPP \u010capljina. They were successively commissioned from 1965 (HPP Dubrovnik) to 1981 (HPP Trebinje II).<br>Remaining 3 hydro power plants belong to subsystem \u201cGornji horizonti\u201d and as it follows: HPP Nevesinje (61 MW), HPP Dabar (160 MW) and HPP Bile\u0107a (30 MW).<br>The subsystem \u201cGornji horizonti\u201d includes using of water on section of the Gata\u010dko field \u2013 the Zalomka river \u2013 the Nevesinje field \u2013 the Dabar field \u2013 the Fatnica field \u2013 the Bile\u0107a accumulation. Some water from north-west part of Nevesinje field will be used in this system in the final phase.<\/p>\n\n\n\n<p>HPP Dabar is the first hydro power plant which will be constructed in area of Gornji horizonti.<br>The water from Po\u0161\u0107enje accumulation to HPP Dabar is carried through headrace tunnel of length of 12.1 km. The headrace tunnel passes through two different geological zones. The inlet structure is located near riverbed of the Zavidolska river and it is far from Po\u0161\u0107enje dam about 3.5 km. The grid and gate for tunnel closure for needs of control and maintenance are designed to be constructed. Two access tunnels (Stra\u017eevica in length of 830 m and Vodostan in length of 295 m) are designed to be constructed for work execution.<\/p>\n\n\n\n<p><strong>Contracted are works as follows:<br>A.<\/strong>&nbsp;INTAKE STRUCTURE, WORKING PLATEAU, CONTROL ROOM AND ACCESS ROAD<br>Intake structure, working plateau P=336.10m2 paved (AB11s and BNS32 d=5+10cm) on th embankment, steel railing around the plateau h=1.12m, hydrant network l= 290.00m DN100; Control room; Access road l=279.00m w=5.00m, road base d=45cm and pavement structure d=15cm; equipment-hydro-mechanical equipment for water intake structure; electrical equipment.<\/p>\n\n\n\n<p><strong>B.<\/strong>&nbsp;HEADRACE TUNNEL length l= 12,125.00m of longitudinal slope i=2.139\u2030; circular clearance of diameter D = 4.6m length 7,853.00m and horse-shoe cross-section l= 4,272.00m length of excavation 5.20m; construction technology: New Austrian Tunnel Method.<\/p>\n\n\n\n<p><strong>C.<\/strong>&nbsp;ADVANCE HEADINGS \u2013 Stra\u017eevica tunnel and Vodostan tunnel<br>Stra\u017eevica tunnel: straight-line tunnel l=651.57m, excavation slope i=7.54%, horse-shoe cross section height 5.5m;<br>Vodostan tunnel: staright-line tunnel l=91.00m, excavation slope i=2.139\u2030, circular cross-section diameter 5.2m.<\/p>\n\n\n\n<p><strong>D.<\/strong>&nbsp;TECHNICAL OBSERVATION<\/p>\n\n\n\n<p><strong>E.<\/strong>&nbsp;EXPLORATION WORKS AND DESIGN DEVELOPMENT during construction.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-themepunch-essgrid essgrid\" data-gridtitle=\"Dabar - galerija, video - EN\"><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Investor:&nbsp;HPP \u201cDabar\u201d Ltd, TrebinjeContract Number:434-18\/16, our ref. 287\/16Value of works:&nbsp;67 m EUR (131 m BAM) Broader context of the Project:The design of using of hydro system Trebi\u0161njica is based on the construction of several hydro technical structures (dams, accumulations, open channels, tunnels and hydro power plants) with which water from karst fields of East Herzegovina [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":28536,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"categories":[35,10],"tags":[],"class_list":["post-84458","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ongoing-projects","category-uncategorized-bs"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering\" \/>\n<meta property=\"og:description\" content=\"Investor:&nbsp;HPP \u201cDabar\u201d Ltd, TrebinjeContract Number:434-18\/16, our ref. 287\/16Value of works:&nbsp;67 m EUR (131 m BAM) Broader context of the Project:The design of using of hydro system Trebi\u0161njica is based on the construction of several hydro technical structures (dams, accumulations, open channels, tunnels and hydro power plants) with which water from karst fields of East Herzegovina [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/\" \/>\n<meta property=\"og:site_name\" content=\"Integral In\u017eenjering\" \/>\n<meta property=\"article:published_time\" content=\"2020-04-07T07:02:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-02-24T14:02:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/proboj-tunela.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"757\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\"},\"headline\":\"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina)\",\"datePublished\":\"2020-04-07T07:02:00+00:00\",\"dateModified\":\"2022-02-24T14:02:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/\"},\"wordCount\":500,\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/proboj-tunela.jpg\",\"articleSection\":[\"Ongoing projects\",\"Uncategorized @bs\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/\",\"name\":\"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/proboj-tunela.jpg\",\"datePublished\":\"2020-04-07T07:02:00+00:00\",\"dateModified\":\"2022-02-24T14:02:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/#primaryimage\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/proboj-tunela.jpg\",\"contentUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/proboj-tunela.jpg\",\"width\":1600,\"height\":757},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/the-dabar-hpp-and-investigation-and-design-works\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/integral.ba\\\/en\\\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"name\":\"Integral In\u017eenjering\",\"description\":\"iic\",\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/integral.ba\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\",\"name\":\"Integral In\u017eenjering\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Integral In\u017eenjering\"},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/user\\\/IntegralGrupa\",\"https:\\\/\\\/sr.wikipedia.org\\\/sr-el\\\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#\\\/schema\\\/person\\\/26cb2b81b17dc2d39605c57901cc93a5\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/","og_locale":"en_US","og_type":"article","og_title":"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","og_description":"Investor:&nbsp;HPP \u201cDabar\u201d Ltd, TrebinjeContract Number:434-18\/16, our ref. 287\/16Value of works:&nbsp;67 m EUR (131 m BAM) Broader context of the Project:The design of using of hydro system Trebi\u0161njica is based on the construction of several hydro technical structures (dams, accumulations, open channels, tunnels and hydro power plants) with which water from karst fields of East Herzegovina [&hellip;]","og_url":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/","og_site_name":"Integral In\u017eenjering","article_published_time":"2020-04-07T07:02:00+00:00","article_modified_time":"2022-02-24T14:02:28+00:00","og_image":[{"width":1600,"height":757,"url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/proboj-tunela.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/#article","isPartOf":{"@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/"},"author":{"name":"admin","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5"},"headline":"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina)","datePublished":"2020-04-07T07:02:00+00:00","dateModified":"2022-02-24T14:02:28+00:00","mainEntityOfPage":{"@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/"},"wordCount":500,"publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"image":{"@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/proboj-tunela.jpg","articleSection":["Ongoing projects","Uncategorized @bs"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/","url":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/","name":"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina) - Integral In\u017eenjering","isPartOf":{"@id":"https:\/\/integral.ba\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/#primaryimage"},"image":{"@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/#primaryimage"},"thumbnailUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/proboj-tunela.jpg","datePublished":"2020-04-07T07:02:00+00:00","dateModified":"2022-02-24T14:02:28+00:00","breadcrumb":{"@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/#primaryimage","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/proboj-tunela.jpg","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/proboj-tunela.jpg","width":1600,"height":757},{"@type":"BreadcrumbList","@id":"https:\/\/integral.ba\/en\/the-dabar-hpp-and-investigation-and-design-works\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/integral.ba\/en\/?lang=en"},{"@type":"ListItem","position":2,"name":"Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina)"}]},{"@type":"WebSite","@id":"https:\/\/integral.ba\/en\/#website","url":"https:\/\/integral.ba\/en\/","name":"Integral In\u017eenjering","description":"iic","publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/integral.ba\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/integral.ba\/en\/#organization","name":"Integral In\u017eenjering","url":"https:\/\/integral.ba\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/","url":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","contentUrl":"https:\/\/integral.ba\/wp-content\/uploads\/2020\/08\/favicon.png","width":512,"height":512,"caption":"Integral In\u017eenjering"},"image":{"@id":"https:\/\/integral.ba\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.youtube.com\/user\/IntegralGrupa","https:\/\/sr.wikipedia.org\/sr-el\/\u0418\u043d\u0442\u0435\u0433\u0440\u0430\u043b_\u0438\u043d\u0436\u0435\u045a\u0435\u0440\u0438\u043d\u0433"]},{"@type":"Person","@id":"https:\/\/integral.ba\/en\/#\/schema\/person\/26cb2b81b17dc2d39605c57901cc93a5","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/84458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/comments?post=84458"}],"version-history":[{"count":2,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/84458\/revisions"}],"predecessor-version":[{"id":84464,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/84458\/revisions\/84464"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media\/28536"}],"wp:attachment":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media?parent=84458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/categories?post=84458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/tags?post=84458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}