{"id":9505,"date":"2020-04-08T10:46:29","date_gmt":"2020-04-08T08:46:29","guid":{"rendered":"https:\/\/integral.ba\/?p=9505"},"modified":"2021-03-31T14:50:16","modified_gmt":"2021-03-31T12:50:16","slug":"heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma","status":"publish","type":"post","link":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/","title":{"rendered":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia)"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Investor:<\/strong>&nbsp;Public Company \u201cRoads of Serbia\u201d Belgrade<br><strong>Contractor:<\/strong>&nbsp;Integral in\u017eenjering a.d. (PLC)<br><strong>Contract number:<\/strong> RRSP\/RRW-IA3SMRP\/2019-06<br><strong>Work value<\/strong>: 29,8 m BAM \/ 15,2 m EUR<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About the project:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load in the Republic of Serbia will be executed under the traffic, i.e. without total traffic stoppage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The works include the following:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>preliminary works,<\/li><li>works on road base and superstructure,<\/li><li>rehabilitation works on structures (bridges),<\/li><li>works on improvement of drainage system,<\/li><li>works on road belt,<\/li><li>works on placing of traffic signalization and equipment and<\/li><li>works on public lightning.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Investor:&nbsp;Public Company \u201cRoads of Serbia\u201d BelgradeContractor:&nbsp;Integral in\u017eenjering a.d. (PLC)Contract number: RRSP\/RRW-IA3SMRP\/2019-06Work value: 29,8 m BAM \/ 15,2 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","om_disable_all_campaigns":false,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[78],"tags":[],"class_list":["post-9505","post","type-post","status-publish","format-standard","hentry","category-archive-projects"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.0 - aioseo.com -->\n\t<meta name=\"description\" content=\"Investor: Public Company \u201cRoads of Serbia\u201d BelgradeContractor: Integral in\u017eenjering a.d. (PLC)Contract number: RRSP\/RRW-IA3SMRP\/2019-06Work value: 29,8 m BAM \/ 15,2 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"admin\"\/>\n\t<meta name=\"google-site-verification\" content=\"ZGt9ld7wcL3iTRIUjnz2rFvrv-jH08vCS9naazT9BYQ\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.0\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Integral In\u017eenjering - iic\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\u017eenjering\" \/>\n\t\t<meta property=\"og:description\" content=\"Investor: Public Company \u201cRoads of Serbia\u201d BelgradeContractor: Integral in\u017eenjering a.d. (PLC)Contract number: RRSP\/RRW-IA3SMRP\/2019-06Work value: 29,8 m BAM \/ 15,2 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2026\/08\/IIC-Logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2026\/08\/IIC-Logo.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t\t<meta property=\"og:image:height\" content=\"329\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2020-04-08T08:46:29+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2021-03-31T12:50:16+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\u017eenjering\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Investor: Public Company \u201cRoads of Serbia\u201d BelgradeContractor: Integral in\u017eenjering a.d. (PLC)Contract number: RRSP\/RRW-IA3SMRP\/2019-06Work value: 29,8 m BAM \/ 15,2 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/integral.ba\/wp-content\/uploads\/2026\/08\/IIC-Logo.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#blogposting\",\"name\":\"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \\u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \\u2013 intersection Pe\\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\\u017eenjering\",\"headline\":\"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \\u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \\u2013 intersection Pe\\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia)\",\"author\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/author\\\/admin\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/IIC-Logo.png\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#articleImage\",\"width\":800,\"height\":329},\"datePublished\":\"2020-04-08T10:46:29+02:00\",\"dateModified\":\"2021-03-31T14:50:16+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#webpage\"},\"articleSection\":\"Archive Projects, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/category\\\/archive-projects\\\/#listItem\",\"name\":\"Archive Projects\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/category\\\/archive-projects\\\/#listItem\",\"position\":2,\"name\":\"Archive Projects\",\"item\":\"https:\\\/\\\/integral.ba\\\/en\\\/category\\\/archive-projects\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#listItem\",\"name\":\"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \\u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \\u2013 intersection Pe\\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia)\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#listItem\",\"position\":3,\"name\":\"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \\u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \\u2013 intersection Pe\\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia)\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/category\\\/archive-projects\\\/#listItem\",\"name\":\"Archive Projects\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\",\"name\":\"Integral In\\u017eenjering a.d.\",\"description\":\"Integral In\\u017eenjering a.d. \\u2013 regionalni lider u niskogradnji i hidrogradnji, s dugogodi\\u0161njim iskustvom u infrastrukturnim projektima\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"telephone\":\"+38751337401\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/integral.ba\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/IIC-Logo.png\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#organizationLogo\",\"width\":800,\"height\":329},\"image\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/author\\\/admin\\\/#author\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/author\\\/admin\\\/\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"admin\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#webpage\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/\",\"name\":\"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \\u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \\u2013 intersection Pe\\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\\u017eenjering\",\"description\":\"Investor: Public Company \\u201cRoads of Serbia\\u201d BelgradeContractor: Integral in\\u017eenjering a.d. (PLC)Contract number: RRSP\\\/RRW-IA3SMRP\\\/2019-06Work value: 29,8 m BAM \\\/ 15,2 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/author\\\/admin\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/author\\\/admin\\\/#author\"},\"datePublished\":\"2020-04-08T10:46:29+02:00\",\"dateModified\":\"2021-03-31T14:50:16+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/integral.ba\\\/en\\\/\",\"name\":\"Integral In\\u017eenjering\",\"description\":\"iic\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/integral.ba\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\u017eenjering<\/title>\n\n","aioseo_head_json":{"title":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\u017eenjering","description":"Investor: Public Company \u201cRoads of Serbia\u201d BelgradeContractor: Integral in\u017eenjering a.d. (PLC)Contract number: RRSP\/RRW-IA3SMRP\/2019-06Work value: 29,8 m BAM \/ 15,2 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load","canonical_url":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"ZGt9ld7wcL3iTRIUjnz2rFvrv-jH08vCS9naazT9BYQ","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#blogposting","name":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\u017eenjering","headline":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia)","author":{"@id":"https:\/\/integral.ba\/en\/author\/admin\/#author"},"publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/integral.ba\/wp-content\/uploads\/2026\/08\/IIC-Logo.png","@id":"https:\/\/integral.ba\/en\/#articleImage","width":800,"height":329},"datePublished":"2020-04-08T10:46:29+02:00","dateModified":"2021-03-31T14:50:16+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#webpage"},"isPartOf":{"@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#webpage"},"articleSection":"Archive Projects, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/integral.ba\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/integral.ba\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/integral.ba\/en\/category\/archive-projects\/#listItem","name":"Archive Projects"}},{"@type":"ListItem","@id":"https:\/\/integral.ba\/en\/category\/archive-projects\/#listItem","position":2,"name":"Archive Projects","item":"https:\/\/integral.ba\/en\/category\/archive-projects\/","nextItem":{"@type":"ListItem","@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#listItem","name":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia)"},"previousItem":{"@type":"ListItem","@id":"https:\/\/integral.ba\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#listItem","position":3,"name":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia)","previousItem":{"@type":"ListItem","@id":"https:\/\/integral.ba\/en\/category\/archive-projects\/#listItem","name":"Archive Projects"}}]},{"@type":"Organization","@id":"https:\/\/integral.ba\/en\/#organization","name":"Integral In\u017eenjering a.d.","description":"Integral In\u017eenjering a.d. \u2013 regionalni lider u niskogradnji i hidrogradnji, s dugogodi\u0161njim iskustvom u infrastrukturnim projektima","url":"https:\/\/integral.ba\/en\/","telephone":"+38751337401","logo":{"@type":"ImageObject","url":"https:\/\/integral.ba\/wp-content\/uploads\/2026\/08\/IIC-Logo.png","@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#organizationLogo","width":800,"height":329},"image":{"@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/integral.ba\/en\/author\/admin\/#author","url":"https:\/\/integral.ba\/en\/author\/admin\/","name":"admin","image":{"@type":"ImageObject","@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/382a2dc99ada78464373ee3b839330007497f666902ce4514942fcab7bb7a3f1?s=96&d=mm&r=g","width":96,"height":96,"caption":"admin"}},{"@type":"WebPage","@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#webpage","url":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/","name":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\u017eenjering","description":"Investor: Public Company \u201cRoads of Serbia\u201d BelgradeContractor: Integral in\u017eenjering a.d. (PLC)Contract number: RRSP\/RRW-IA3SMRP\/2019-06Work value: 29,8 m BAM \/ 15,2 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/integral.ba\/en\/#website"},"breadcrumb":{"@id":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/#breadcrumblist"},"author":{"@id":"https:\/\/integral.ba\/en\/author\/admin\/#author"},"creator":{"@id":"https:\/\/integral.ba\/en\/author\/admin\/#author"},"datePublished":"2020-04-08T10:46:29+02:00","dateModified":"2021-03-31T14:50:16+02:00"},{"@type":"WebSite","@id":"https:\/\/integral.ba\/en\/#website","url":"https:\/\/integral.ba\/en\/","name":"Integral In\u017eenjering","description":"iic","inLanguage":"en-US","publisher":{"@id":"https:\/\/integral.ba\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Integral In\u017eenjering - iic","og:type":"article","og:title":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\u017eenjering","og:description":"Investor: Public Company \u201cRoads of Serbia\u201d BelgradeContractor: Integral in\u017eenjering a.d. (PLC)Contract number: RRSP\/RRW-IA3SMRP\/2019-06Work value: 29,8 m BAM \/ 15,2 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load","og:url":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/","og:image":"https:\/\/integral.ba\/wp-content\/uploads\/2026\/08\/IIC-Logo.png","og:image:secure_url":"https:\/\/integral.ba\/wp-content\/uploads\/2026\/08\/IIC-Logo.png","og:image:width":800,"og:image:height":329,"article:published_time":"2020-04-08T08:46:29+00:00","article:modified_time":"2021-03-31T12:50:16+00:00","twitter:card":"summary_large_image","twitter:title":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia) - Integral In\u017eenjering","twitter:description":"Investor: Public Company \u201cRoads of Serbia\u201d BelgradeContractor: Integral in\u017eenjering a.d. (PLC)Contract number: RRSP\/RRW-IA3SMRP\/2019-06Work value: 29,8 m BAM \/ 15,2 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3 (motorway) in total length of L=13,75 km (left cariageway) and L=13,10 km (right cariageway). Works on section with the biggest traffic load","twitter:image":"https:\/\/integral.ba\/wp-content\/uploads\/2026\/08\/IIC-Logo.png"},"aioseo_meta_data":{"post_id":"9505","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-08-05 13:29:02","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-08-05 13:29:02","updated":"2026-08-05 13:29:02"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/integral.ba\/en\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/integral.ba\/en\/category\/archive-projects\/\" title=\"Archive Projects\">Archive Projects<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tHeavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia)\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/integral.ba\/en\/"},{"label":"Archive Projects","link":"https:\/\/integral.ba\/en\/category\/archive-projects\/"},{"label":"Heavy maintenance (upgrading) of the state road IA3, section: intersection Sremska Mitrovica \u2013 intersection Ruma, from km 43+563 to km 57+313 l=13,750 (left cariageway) and intersection Ruma \u2013 intersection Pe\u0107inci from km 57+205 to km 70+303, l=13,098 km (right cariageway), (Serbia)","link":"https:\/\/integral.ba\/en\/heavy-maintenance-upgrading-of-the-state-road-ia3-section-intersection-sremska-mitrovica-intersection-ruma-from-km-43563-to-km-57313-l13750-left-cariageway-and-intersection-ruma\/"}],"_links":{"self":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/9505","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/comments?post=9505"}],"version-history":[{"count":5,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/9505\/revisions"}],"predecessor-version":[{"id":42181,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/posts\/9505\/revisions\/42181"}],"wp:attachment":[{"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/media?parent=9505"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/categories?post=9505"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/integral.ba\/en\/wp-json\/wp\/v2\/tags?post=9505"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}