+387 (0)51 337 401
  • YouTube
  • YouTube
Execution of the exploratory works and works on the rehabilitation of landslide Sarlah within the project of construction of motorway E80, Niš (Prosek) – Dimitrovgrad (border crossing with Bulgaria), section 5A: Staničenje – Sarlah

Execution of the exploratory works and works on the rehabilitation of landslide Sarlah within the project of construction of motorway E80, Niš (Prosek) – Dimitrovgrad (border crossing with Bulgaria), section 5A: Staničenje – Sarlah

Investor: Koridori Srbije, d.o.o. (LLC) BelgradeContractor: Integral inženjering a.d. (PLC) Banja LukaValue of works: 6,6 million BAM or 3,4 million EUR About project: Corridor 10 is one of the most important pan-European transport corridors that pass through Serbia....
Construction of the main road M-17.3 Neum – Stolac, Lot 1

Construction of the main road M-17.3 Neum – Stolac, Lot 1

Employer:PC “Roads of the Federation of Bosnia and Herzegovina“ d.o.o. (PLC) SarajevoContractor:“Integral Inženjering“ a.d. (LTD) LaktašiContract value:6.03 million BAM or 3.08 million EUREngineer:IC consulenten Ziviltechniker GesmbH (Austria) in cooperation with...
Corridor 10 Motorway Project, Construction of Motorway E75, Section: Caričina Dolina – Vladičin Han, LOT 5: Road and Bridges at sub-Section Caričina Dolina – Tunnel Manajle (Serbia)

Corridor 10 Motorway Project, Construction of Motorway E75, Section: Caričina Dolina – Vladičin Han, LOT 5: Road and Bridges at sub-Section Caričina Dolina – Tunnel Manajle (Serbia)

Investor: Public company “Corridors of Serbia”Contractor: Integral inženjeringContract number: CORRX.E75.EIB.PACK2-LOT5.ICBSubject of the contract: Design and construction of the road and bridges at sub-section Caričina dolina – tunnel Manajle...
#1 CIVIL CONSTRUCTION COMPANY IN B&H
#1 GRAĐEVINSKA KOMPANIJA U BIH