Execution of part of works on landslide stabilization in the cut zone no. 4 from km 878+675 to km 879+200, Phase II within the E75 motorway construction project, Section: Grdelica (Gornje Polje) – Caričina dolina LOT 1: Road and bridges from Grdelica to the Predejane tunnel (Serbia)

Execution of part of works on landslide stabilization in the cut zone no. 4 from km 878+675 to km 879+200, Phase II within the E75 motorway construction project, Section: Grdelica (Gornje Polje) – Caričina dolina LOT 1: Road and bridges from Grdelica to the Predejane tunnel (Serbia)

Investor: Koridori Srbije d.o.o. (LLC) BelgradeContractor: Integral inženjering a.d. (JSC) LaktašiWork values: BAM 26.5 million or EUR 13.5 million  General information about the project:ct: Corridor 10 is one of the most important pan-European...