Execution of the part of works on landslide stabilization in the zone od the cut no. 2 from km 876+075 to km 876+225, Phase II within the Project of construction of the motorway E75, Section: Grdelica (Gornje Polje) – Caričina dolina LOT 1: Road and bridges from Grdelica to the tunnel Predejane (Serbia)

Execution of the part of works on landslide stabilization in the zone od the cut no. 2 from km 876+075 to km 876+225, Phase II within the Project of construction of the motorway E75, Section: Grdelica (Gornje Polje) – Caričina dolina LOT 1: Road and bridges from Grdelica to the tunnel Predejane (Serbia)

Investor: Koridori Srbije, d.o.o. (LLC) BelgradeContractor: Integral inženjering a.d. (PLC) LaktašiValue of works: 37.7 million BAM or 19.3 million EUR General information on the project: Corridor 10 is one of the most significant Pan-European transport...
Heavy maintenance (upgrading) of the state road  IA3, section: border CRO/SER (Batrovci) – Kuzmin 1, from  km 0+554.86 to km 22+196.11 (left carriageway) and from km 0+564.64 to km 22+229.16 (right carriageway)

Heavy maintenance (upgrading) of the state road IA3, section: border CRO/SER (Batrovci) – Kuzmin 1, from km 0+554.86 to km 22+196.11 (left carriageway) and from km 0+564.64 to km 22+229.16 (right carriageway)

CONTRACT NUMBER RRSP/RRW-IA3BK/2017-07Investor: PC “Roads of Serbia” BelgradeContractor: Integral inženjering a.d. (PLC)Work value: 38,7  million BAM or 19,8 m EUR About the project: The project includes heavy maintenance (upgrading) of the state road IA3...
Regulation of the Janja riverbed in Ugljevik

Regulation of the Janja riverbed in Ugljevik

Contracting authority: European Union represented by European Commission B-1049 Brussels, BelgiumContractor: JV “Integral inženjering“ a.d. (LTD) Laktaši and “Integra inženjering” d.o.o. (PLC) Banja LukaProject value: 5.25 million BAM or 2.69 million...
Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina)

Construction of headrace tunnel, intake structure and advance headings for the Dabar HPP and investigation and design works during construction (Republic of Srpska, Bosnia and Herzegovina)

Investor: HPP “Dabar” Ltd, TrebinjeContract Number:434-18/16, our ref. 287/16Value of works: 67 m EUR (131 m BAM) Broader context of the Project:The design of using of hydro system Trebišnjica is based on the construction of several hydro technical...