04.08.2020 Headrace tunnel for HPP Dabar: Breakthrough between the excavation points 3 and 4 achieved
14.02.2020 Works on construction and reconstruction of Courts and Prosecutors Office in Tuzla are completed
11.10.2019 The bridge over the Sava river near Gradiška: The opening ceremony of commencement of works
03.04.2019 Motorway E 75 on Coridor 10 in the Republic of Serbia: Finishing works on slope protection (cuts 2 and 5)
03.10.2018 Motorway E 75 on Corridor 10 in the Republic of Serbia Lot 1: Intensive works on slope protection (cuts 5 and 2)